Size |
799 ft long x 55 ft wide |
799 ft long x 48 ft wide |
207 ft long x 68.5 ft wide |
|
Water Depth |
1A &1B: 36+ ft @ Mean Low Lower Water |
Berth 2A: 35+ ft and Berth 2B: 32+ ft @ Mean Low Lower Water |
14+ ft @ Mean Low Lower Water |
|
Capacity |
Lateral Load @ 3,135.6 kips |
Lateral Load @ 1,625.7 kips plus 3ea 300-ton dolphins |
|
|
Electric Power |
8,000 amps, 450 volts, 3 phase |
5,000 amps, 450 volts, 3 phase |
1,200 amps, 450 volts, 3 phase |
|
Steam |
24,200 lbs / hour @ 150 PSIG |
|
12,000 lbs / hour @ 150 PSIG |
|
Potable Water |
288,000 GPD @ 80 PSIG |
288,000 GPD @ 80 PSIG |
144,000 GPD @ 80 PSIG |
|
Fire Main |
2,900 GPM @ 150 PSIG |
|
1,000 GPM @ 150 PSIG |
|
Feed Water |
Unlimited (by contract) |
Unlimited (by contract) |
Unlimited (by contract) |
|
Compressed Air |
1,500 CFM @ 125 PSIG |
|
1,500 CFM @ 125 PSIG |
|
Sewage Disposal |
6" Sanitary Main to City Main @ 544,000 GPD |
6" Sanitary Main to City Main @ 544,000 GPD |
6" Sanitary Main to City Main @ 544,000 GPD |
|
Cranes |
75 Ton Mobile Crane (additional as required) |
75 Ton Mobile Crane (additional as required) |
75 Ton Mobile Crane (additional as required) |
|
Phone Lines |
30 Direct Trunk Lines (15 each side of pier) |
30 Direct Trunk Lines (15 each side of pier) |
15 Direct Trunk Lines |
|
Fiber Optics |
Direct Connection Available Each Side of Pier |
Direct Connection Available Each Side of Pier |
Direct Connection Available |
|
Fire Alarm |
Permanent Fire Alarm each side of Pier |
Permanent Fire Alarm each side of Pier |
Permanent Fire Alarm System |
|
Flooding Alarm |
Permanent Flooding Alarm each side of Pier |
Permanent Flooding Alarm each side of Pier |
Permanent Flooding Alarm System |
|
Security |
Controlled Access by Facility Security Service |
Controlled Access by Facility Security Service |
Controlled Access by Facility Security Service |
|
|
|
|
|
|
|
|
| . |
. |
. |
. |